skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #94811:

New technology for the structural design of cost optimal installations for the production of hydrocarbons / Inge Lotsberg, Kåre Kristoffersen.

Title: New technology for the structural design of cost optimal installations for the production of hydrocarbons / Inge Lotsberg, Kåre Kristoffersen.
Author(s): Lotsberg, Inge.
Kristoffersen, Kåre.
Date: 1988.
Publisher: Trondheim: Tapir Publishers
In: Polartech '88. International Conference on Technology for Polar Areas, the Norwegian Institute of Technology, Trondheim, Norway, 15-17 June 1988. Proceedings. (1988.), Vol. 2.
Abstract: Focuses on development of new technology for optimization of life time costs of offshore structures. Includes costs associated with design, fabrication, installation, inservice control, maintenance and repair in addition to expected costs resulting from production down time due to environment limitations and structural and component failure.
Notes:

In: Polartech '88. International Conference on Technology for Polar Areas, the Norwegian Institute of Technology, Trondheim, Norway, 15-17 June 1988. Proceedings. Vol. 2. / Arnold Hansen, Just F. Storm, eds.

Keywords: 622.32 -- Petroleum, extraction.
622.24 -- Drilling and boring.
624.14 -- Snow and ice engineering.
M -- Engineering and construction.
(*60) -- Arctic Ocean and adjacent waters.
SPRI record no.: 94811

MARCXML

LDR 01613naa#a2200000#a#4500
001 SPRI-94811
005 20230329081013.0
007 ta
008 230329s1988####no#a###|#####|0||#0#eng#d
035 ## ‡aSPRI-94811
040 ## ‡aUkCU-P‡beng‡eaacr
100 1# ‡aLotsberg, Inge.
245 10 ‡aNew technology for the structural design of cost optimal installations for the production of hydrocarbons /‡cInge Lotsberg, Kåre Kristoffersen.
260 ## ‡aTrondheim :‡bTapir Publishers,‡c1988.
300 ## ‡ap. 539-550 :‡bdiags.
500 ## ‡aIn: Polartech '88. International Conference on Technology for Polar Areas, the Norwegian Institute of Technology, Trondheim, Norway, 15-17 June 1988. Proceedings. Vol. 2. / Arnold Hansen, Just F. Storm, eds.
520 3# ‡aFocuses on development of new technology for optimization of life time costs of offshore structures. Includes costs associated with design, fabrication, installation, inservice control, maintenance and repair in addition to expected costs resulting from production down time due to environment limitations and structural and component failure.
650 07 ‡a622.32 -- Petroleum, extraction.‡2udc
650 07 ‡a622.24 -- Drilling and boring.‡2udc
650 07 ‡a624.14 -- Snow and ice engineering.‡2udc
650 07 ‡aM -- Engineering and construction.‡2local
651 #7 ‡a(*60) -- Arctic Ocean and adjacent waters.‡2udc
700 1# ‡aKristoffersen, Kåre.
773 0# ‡7nnam ‡aArnold Hansen, Just F. Storm, eds. ‡tPolartech '88. International Conference on Technology for Polar Areas, the Norwegian Institute of Technology, Trondheim, Norway, 15-17 June 1988. Proceedings. ‡dTrondheim : Tapir Publishers, 1988. ‡gVol. 2. ‡wSPRI-94845
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20230329