SPRI library catalogue
View a record
Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.
Please search for material in iDiscover for up-to-date information about the library collection.
Record #94584:
Embankment failure from creep of permafrost foundation soils; a case history / R. McHattie, D. Esch.
Title: | Embankment failure from creep of permafrost foundation soils; a case history / R. McHattie, D. Esch. |
Author(s): | McHattie, R. Esch, D. |
Date: | 1988. |
Publisher: | Trondheim: Tapir Publishers |
In: | Permafrost. Fifth International Conference. August 2-5, 1988. Proceedings. (1988.), Vol. 2. |
Abstract: | Road section 10.6 m in height was constructed in 1975 over warm silt permafrost near Fairbanks, AK, and was observed to have settled noticeably due to creep of permafrost after several years of service. Road was reconstructed using wood chips as lightweight fill-replacement material. |
Notes: | In: Permafrost. Fifth International Conference. August 2-5, 1988. Proceedings. Vol. 2. / Kaare Senneset, ed. |
Keywords: | 624.139.24 -- Settling and caving due to thawing. 625.7 -- Road construction and maintenance. 624.139.62 -- Permafrost control. E12 -- Glaciology: frozen ground / snow and ice engineering. |
SPRI record no.: | 94584 |
LDR 01298naa#a2200000#a#4500 001 SPRI-94584 005 20231202083120.0 007 ta 008 231202s1988####no#a###|#####|0||#0#eng#d 035 ## ‡aSPRI-94584 040 ## ‡aUkCU-P‡beng‡eaacr 100 1# ‡aMcHattie, R. 245 10 ‡aEmbankment failure from creep of permafrost foundation soils; a case history /‡cR. McHattie, D. Esch. 260 ## ‡aTrondheim :‡bTapir Publishers,‡c1988. 300 ## ‡ap. 1292-1297 :‡bdiags. 500 ## ‡aIn: Permafrost. Fifth International Conference. August 2-5, 1988. Proceedings. Vol. 2. / Kaare Senneset, ed. 520 3# ‡aRoad section 10.6 m in height was constructed in 1975 over warm silt permafrost near Fairbanks, AK, and was observed to have settled noticeably due to creep of permafrost after several years of service. Road was reconstructed using wood chips as lightweight fill-replacement material. 650 07 ‡a624.139.24 -- Settling and caving due to thawing.‡2udc 650 07 ‡a625.7 -- Road construction and maintenance.‡2udc 650 07 ‡a624.139.62 -- Permafrost control.‡2udc 650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local 700 1# ‡aEsch, D. 773 0# ‡7nnam ‡aKaare Senneset, ed. ‡tPermafrost. Fifth International Conference. August 2-5, 1988. Proceedings. ‡dTrondheim : Tapir Publishers, 1988. ‡gVol. 2. ‡wSPRI-93838 917 ## ‡aUnenhanced record from Muscat, imported 2019 948 3# ‡a20231202