skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #94421:

Ground freezing for the construction of a drain pump chamber in gravel between the twin tunnels in Kyoto / S. Murayama, T. Kunieda, T. Sato, K. Miyamoto, T. Hashimoto, K. Goto.

Title: Ground freezing for the construction of a drain pump chamber in gravel between the twin tunnels in Kyoto / S. Murayama, T. Kunieda, T. Sato, K. Miyamoto, T. Hashimoto, K. Goto.
Author(s): Murayama, S.
Kunieda, T.
Sato, T.
Miyamoto, K.
Hashimoto, T.
Goto, K.
Date: 1988.
Publisher: Rotterdam: A.A. Balkema
In: Ground freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. (1988.), Vol. 1.
Abstract: Describes method used in excavation work for constructing pump chamber between two parallel shield tunnels in gravel soil with large underground water flow.
Notes:

In: Ground freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. Vol. 1. / R.H. Jones, J.T. Holden, eds.

Keywords: 624.139.62 -- Permafrost control.
E12 -- Glaciology: frozen ground / snow and ice engineering.
(520) -- Japan.
SPRI record no.: 94421

MARCXML

LDR 01339naa#a2200000#a#4500
001 SPRI-94421
005 20240419020413.0
007 ta
008 240419s1988####ne#a###|#####|0||#0#eng#d
035 ## ‡aSPRI-94421
040 ## ‡aUkCU-P‡beng‡eaacr
245 00 ‡aGround freezing for the construction of a drain pump chamber in gravel between the twin tunnels in Kyoto /‡cS. Murayama, T. Kunieda, T. Sato, K. Miyamoto, T. Hashimoto, K. Goto.
260 ## ‡aRotterdam :‡bA.A. Balkema,‡c1988.
300 ## ‡ap. 377-382 :‡bdiags.
500 ## ‡aIn: Ground freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. Vol. 1. / R.H. Jones, J.T. Holden, eds.
520 3# ‡aDescribes method used in excavation work for constructing pump chamber between two parallel shield tunnels in gravel soil with large underground water flow.
650 07 ‡a624.139.62 -- Permafrost control.‡2udc
650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local
651 #7 ‡a(520) -- Japan.‡2udc
700 1# ‡aMurayama, S.
700 1# ‡aKunieda, T.
700 1# ‡aSato, T.
700 1# ‡aMiyamoto, K.
700 1# ‡aHashimoto, T.
700 1# ‡aGoto, K.
773 0# ‡7nnam ‡aR.H. Jones, J.T. Holden, eds. ‡tGround freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. ‡dRotterdam : A.A. Balkema, 1988-1989. ‡gVol. 1. ‡wSPRI-94106
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20240419