skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #94415:

Vienna subway construction - use of brine freezing in combination with NATM under compressed air / Franz Deix, Bernd Braun.

Title: Vienna subway construction - use of brine freezing in combination with NATM under compressed air / Franz Deix, Bernd Braun.
Author(s): Deix, Franz.
Braun, Bernd.
Date: 1988.
Publisher: Rotterdam: A.A. Balkema
In: Ground freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. (1988.), Vol. 1.
Abstract: Presents case history of underground railway in Vienna, Austria, without surface disturbance. For tunnel construction, New Austrian Tunnelling Method was chosen, supplemented by air-pressure stabilization.
Notes:

In: Ground freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. Vol. 1. / R.H. Jones, J.T. Holden, eds.

Keywords: 624.139.62 -- Permafrost control.
625.1 -- Railway engineering.
624.19 -- Tunnels and tunnelling.
E12 -- Glaciology: frozen ground / snow and ice engineering.
(436) -- Austria.
SPRI record no.: 94415

MARCXML

LDR 01365naa#a2200000#a#4500
001 SPRI-94415
005 20230321082945.0
007 ta
008 230321s1988####ne#a###|#####|0||#0#eng#d
035 ## ‡aSPRI-94415
040 ## ‡aUkCU-P‡beng‡eaacr
100 1# ‡aDeix, Franz.
245 10 ‡aVienna subway construction - use of brine freezing in combination with NATM under compressed air /‡cFranz Deix, Bernd Braun.
260 ## ‡aRotterdam :‡bA.A. Balkema,‡c1988.
300 ## ‡ap. 321-330 :‡bill., diags., tables.
500 ## ‡aIn: Ground freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. Vol. 1. / R.H. Jones, J.T. Holden, eds.
520 3# ‡aPresents case history of underground railway in Vienna, Austria, without surface disturbance. For tunnel construction, New Austrian Tunnelling Method was chosen, supplemented by air-pressure stabilization.
650 07 ‡a624.139.62 -- Permafrost control.‡2udc
650 07 ‡a625.1 -- Railway engineering.‡2udc
650 07 ‡a624.19 -- Tunnels and tunnelling.‡2udc
650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local
651 #7 ‡a(436) -- Austria.‡2udc
700 1# ‡aBraun, Bernd.
773 0# ‡7nnam ‡aR.H. Jones, J.T. Holden, eds. ‡tGround freezing 88. Proceedings of the Fifth International Symposium on Ground Freezing, Nottingham, 28-28 July 1988. ‡dRotterdam : A.A. Balkema, 1988-1989. ‡gVol. 1. ‡wSPRI-94106
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20230321