skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #94350:

Foundation considerations for siting and designing the Red Dog mine mill facilities on permafrost / T.G. Krzewinski, Theodore A. Hammer, G.G. Booth.

Title: Foundation considerations for siting and designing the Red Dog mine mill facilities on permafrost / T.G. Krzewinski, Theodore A. Hammer, G.G. Booth.
Author(s): Krzewinski, T. G.
Hammer, Theodore A.
Booth, G. G.
Date: 1988.
Publisher: Trondheim: Tapir Publishers
In: Permafrost. Fifth International Conference. August 2-5, 1988. Proceedings. (1988.), Vol. 2.
Abstract: Construction began at this site in north-west Alaska in winter 1988. Mill will be located next to open-pit mine on relatively warm permafrost. Summarizes site characteristics and describes analytical and design techniques used to found various components of mill facility.
Notes:

In: Permafrost. Fifth International Conference. August 2-5, 1988. Proceedings. Vol. 2. / Kaare Senneset, ed.

Keywords: 624.139.2 -- Frozen ground, effects.
622 -- Mining.
624.15 -- Foundations.
E12 -- Glaciology: frozen ground / snow and ice engineering.
(*49) -- Alaska.
(*494) -- Alaska, northwestern.
SPRI record no.: 94350

MARCXML

LDR 01399naa#a2200000#a#4500
001 SPRI-94350
005 20230323144357.0
007 ta
008 230323s1988####no#ab##|#####|0||#0#eng#d
035 ## ‡aSPRI-94350
040 ## ‡aUkCU-P‡beng‡eaacr
100 1# ‡aKrzewinski, T. G.
245 10 ‡aFoundation considerations for siting and designing the Red Dog mine mill facilities on permafrost /‡cT.G. Krzewinski, Theodore A. Hammer, G.G. Booth.
260 ## ‡aTrondheim :‡bTapir Publishers,‡c1988.
300 ## ‡ap. 955-960 :‡bdiag., map.
500 ## ‡aIn: Permafrost. Fifth International Conference. August 2-5, 1988. Proceedings. Vol. 2. / Kaare Senneset, ed.
520 3# ‡aConstruction began at this site in north-west Alaska in winter 1988. Mill will be located next to open-pit mine on relatively warm permafrost. Summarizes site characteristics and describes analytical and design techniques used to found various components of mill facility.
650 07 ‡a624.139.2 -- Frozen ground, effects.‡2udc
650 07 ‡a622 -- Mining.‡2udc
650 07 ‡a624.15 -- Foundations.‡2udc
650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local
651 #7 ‡a(*49) -- Alaska.‡2udc
651 #7 ‡a(*494) -- Alaska, northwestern.‡2udc
700 1# ‡aHammer, Theodore A.
700 1# ‡aBooth, G. G.
773 0# ‡7nnam ‡aKaare Senneset, ed. ‡tPermafrost. Fifth International Conference. August 2-5, 1988. Proceedings. ‡dTrondheim : Tapir Publishers, 1988. ‡gVol. 2. ‡wSPRI-93838
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20230323