skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #75374:

Sand ground freezing for the construction of a subway station in Brussels / P. Gonze, M. Lejeune, J.F. Thimus, A. Monjoie.

Title: Sand ground freezing for the construction of a subway station in Brussels / P. Gonze, M. Lejeune, J.F. Thimus, A. Monjoie.
Author(s): Gonze, P.
Lejeune, M.
Thimus, J. F.
Monjoie, A.
Date: 1985.
Publisher: Rotterdam: A.A. Balkema
In: Proceedings of the Fourth International Symposium on Ground Freezing/Sapporo/5-7 August 1985. Ground freezing. (1985.),
Abstract: Construction carried out under protection of horizontal slab of artificially frozen soil to separate surface buildings from engineering works. Describes technique. Maximum settlement after completion was 5 mm.
Notes:

In: Proceedings of the Fourth International Symposium on Ground Freezing/Sapporo/5-7 August 1985. Ground freezing / Seiiti Kinosita, Masami Fukuda, eds.

Keywords: 624.139.62 -- Permafrost control.
E12 -- Glaciology: frozen ground / snow and ice engineering.
(493) -- Belgium.
SPRI record no.: 75374

MARCXML

LDR 01284naa#a2200000#a#4500
001 SPRI-75374
005 20240329073548.0
007 ta
008 240329s1985####ne#a###|#####|0||#0#eng#d
035 ## ‡aSPRI-75374
040 ## ‡aUkCU-P‡beng‡eaacr
245 00 ‡aSand ground freezing for the construction of a subway station in Brussels /‡cP. Gonze, M. Lejeune, J.F. Thimus, A. Monjoie.
260 ## ‡aRotterdam :‡bA.A. Balkema,‡c1985.
300 ## ‡ap. 277-283 :‡bdiags., table.
500 ## ‡aIn: Proceedings of the Fourth International Symposium on Ground Freezing/Sapporo/5-7 August 1985. Ground freezing / Seiiti Kinosita, Masami Fukuda, eds.
520 3# ‡aConstruction carried out under protection of horizontal slab of artificially frozen soil to separate surface buildings from engineering works. Describes technique. Maximum settlement after completion was 5 mm.
650 07 ‡a624.139.62 -- Permafrost control.‡2udc
650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local
651 #7 ‡a(493) -- Belgium.‡2udc
700 1# ‡aGonze, P.
700 1# ‡aLejeune, M.
700 1# ‡aThimus, J. F.
700 1# ‡aMonjoie, A.
773 0# ‡7nnam ‡aSeiiti Kinosita, Masami Fukuda, eds. ‡tProceedings of the Fourth International Symposium on Ground Freezing/Sapporo/5-7 August 1985. Ground freezing. ‡dRotterdam : A.A. Balkema, 1985. ‡wSPRI-75337
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20240329