skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #75162:

Mooring system for cutters in Arsuk, Greenland / Niels Nondal.

Title: Mooring system for cutters in Arsuk, Greenland / Niels Nondal.
Author(s): Nondal, Niels.
Date: [1985]
Publisher: Hørsholm: Danish Hydraulic Institute
In: POAC 85 : the 8th International Conference on Port and Ocean Engineering under Arctic Conditions, Narssarssuaq, Greenland, September 7-14, 1985. Proceedings. Vol. 1. ([1985]),
Abstract: Describes new mooring arrangement for fishing fleet, operational since 1982-83. Boats are now moored to buoys, and floating ice barrier, over which they can sail, has been established to protect them from drift ice.
Notes:

In: POAC 85 : the 8th International Conference on Port and Ocean Engineering under Arctic Conditions, Narssarssuaq, Greenland, September 7-14, 1985. Proceedings. Vol. 1 / Conference on Port and Ocean Engineering Under Arctic Conditions.

Keywords: 624.145.6 -- Floating ice, control.
627.2 -- Ports, harbours and anchorages: engineering construction.
E12 -- Glaciology: frozen ground / snow and ice engineering.
(*38) -- Greenland.
(*384.68) -- Paamiut/Frederikshab.
SPRI record no.: 75162

MARCXML

LDR 01507naa#a2200000#a#4500
001 SPRI-75162
005 20240329101550.0
007 ta
008 240329s1985####dk#ab##|#####|0||#0#eng#d
035 ## ‡aSPRI-75162
040 ## ‡aUkCU-P‡beng‡eaacr
100 1# ‡aNondal, Niels.
245 10 ‡aMooring system for cutters in Arsuk, Greenland /‡cNiels Nondal.
260 ## ‡aHørsholm :‡bDanish Hydraulic Institute,‡c[1985]
300 ## ‡ap. 490-499 :‡billus., diags., maps.
500 ## ‡aIn: POAC 85 : the 8th International Conference on Port and Ocean Engineering under Arctic Conditions, Narssarssuaq, Greenland, September 7-14, 1985. Proceedings. Vol. 1 / Conference on Port and Ocean Engineering Under Arctic Conditions.
520 3# ‡aDescribes new mooring arrangement for fishing fleet, operational since 1982-83. Boats are now moored to buoys, and floating ice barrier, over which they can sail, has been established to protect them from drift ice.
650 07 ‡a624.145.6 -- Floating ice, control.‡2udc
650 07 ‡a627.2 -- Ports, harbours and anchorages: engineering construction.‡2udc
650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local
651 #7 ‡a(*38) -- Greenland.‡2udc
651 #7 ‡a(*384.68) -- Paamiut/Frederikshab.‡2udc
773 0# ‡7m2am ‡aConference on Port and Ocean Engineering Under Arctic Conditions. ‡tPOAC 85 : the 8th International Conference on Port and Ocean Engineering under Arctic Conditions, Narssarssuaq, Greenland, September 7-14, 1985. Proceedings. Vol. 1. ‡dHørsholm : Danish Hydraulic Institute, [1985] ‡wSPRI-75130
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20240329