Construction of a water storage dam on permafrost. Discharge and blocking up the river during construction of the Vilyui hydro-electric power station / G.F. Biyanov.
Title: | Construction of a water storage dam on permafrost. Discharge and blocking up the river during construction of the Vilyui hydro-electric power station / G.F. Biyanov. |
Author(s): | Biyanov, G. F. |
Date: | 1969. |
Publisher: | Ottawa: National Research Council of Canada |
Abstract: | Translated by V. Poppe from Gidrotekhnicheskoe Stroitel'stvo, Vol.10, 1965, p.13-23 and Vol.2, 1966, p.1-5. First article describes dam at Mirnyy, north-west Yakutia, foundation and core being maintained in frozen state by duct system circulating cold air. Second article describes construction schedule and placing of materials under severe conditions for large rock-fill dam in Siberia. |
Keywords: | 624.139 -- Engineering in frozen ground. 627.8 -- Dams and reservoirs. E12 -- Glaciology: frozen ground / snow and ice engineering. |
Location(s): | SCO: SPRI-SHF: 624.139 : 627.8 |
SPRI record no.: | 45444 |
LDR 01232nam#a2200000#a#4500 001 SPRI-45444 005 20240329052206.0 007 ta 008 240329s1969####onca###|#####|0||#0#eng#d 035 ## ‡aSPRI-45444 040 ## ‡aUkCU-P‡beng‡eaacr 100 1# ‡aBiyanov, G. F. 245 10 ‡aConstruction of a water storage dam on permafrost. Discharge and blocking up the river during construction of the Vilyui hydro-electric power station /‡cG.F. Biyanov. 260 ## ‡aOttawa :‡bNational Research Council of Canada,‡c1969. 300 ## ‡a30 leaves :‡billus. ;‡c27.5 cm. 490 0# ‡aTechnical Translation ;‡v1353 520 3# ‡aTranslated by V. Poppe from Gidrotekhnicheskoe Stroitel'stvo, Vol.10, 1965, p.13-23 and Vol.2, 1966, p.1-5. First article describes dam at Mirnyy, north-west Yakutia, foundation and core being maintained in frozen state by duct system circulating cold air. Second article describes construction schedule and placing of materials under severe conditions for large rock-fill dam in Siberia. 650 07 ‡a624.139 -- Engineering in frozen ground.‡2udc 650 07 ‡a627.8 -- Dams and reservoirs.‡2udc 650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local 852 7# ‡2camdept‡bSCO‡cSPRI-SHF‡h624.139 : 627.8‡9Create 1 item record‡0Migrate 917 ## ‡aUnenhanced record from Muscat, imported 2019 948 3# ‡a20240329