SPRI library catalogue
View a record
Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.
Please search for material in iDiscover for up-to-date information about the library collection.
Record #168358:
Study on construction technology for cutting blasting in high-ice-content permafrost region at Kunlun mountain pass on Qinghai-Tibet railway / Yongyi Wang.
Title: | Study on construction technology for cutting blasting in high-ice-content permafrost region at Kunlun mountain pass on Qinghai-Tibet railway / Yongyi Wang. |
Author(s): | Wang, Yongyi. |
Date: | 2002. |
Language: | Chinese. |
In: | Journal of Glaciology and Geocryology. (2002.), Vol. 25(1) (2002) |
Abstract: | Addresses problems of constructing cuttings in high-ice-content permafrost during warm season, taking typical construction on Qinghai-Tibet railway as example. Presents typical cutting cross section, contemporary meteorological data and diagrams of layout and charging structure for top and slope blasting holes. Provides principles for successful construction, including: adopt schedule to avoid construction in high temperatures; facilitate water drainage before beginning main construction; it is better to over-, rather than under-excavate, so as to meet required thickness of topsoil replacement; carry out blasting in two layers, initially leaving protecting layer 2 m thick for lessening permafrost disturbance. Make recommendations for blasting hole arrangement charging structure. |
Notes: | Journal of Glaciology and Geocryology. Vol. 25(1) :100-105 (2002). English summary and captions. |
Keywords: | 624.139 -- Engineering in frozen ground. 624.133 -- Excavation. 625.1 -- Railway engineering. 624.139.55 -- Frozen ground, disturbance by engineering works. 551.34 -- Geocryology. Frozen ground. 551.341 -- Permafrost and frozen ground, equipment for investigating. 551.321.2 -- Snow and ice, methods of sampling, excavating, drilling, etc. 626.86 -- Drainage. 622.235 -- Ice and snow, blasting. 536 -- Heat. E12 -- Glaciology: frozen ground / snow and ice engineering. (515) -- Tibet. (235.23) -- Kun-Lun Shan. (235.24) -- Himalayas. Karakorum. Tibetan plateau. |
SPRI record no.: | 168358 |
LDR 02294naa#a2200000#a#4500 001 SPRI-168358 005 20240328155432.0 007 ta 008 240328s2002####xx#a##|##|###|0||#0|chi#d 035 ## ‡aSPRI-168358 040 ## ‡aUkCU-P‡beng‡eaacr 041 0# ‡achi 100 1# ‡aWang, Yongyi. 245 10 ‡aStudy on construction technology for cutting blasting in high-ice-content permafrost region at Kunlun mountain pass on Qinghai-Tibet railway /‡cYongyi Wang. 260 ## ‡a[S.l.] :‡b[s.n.],‡c2002. 300 ## ‡ap. 100-105 :‡bdiags., table. 500 ## ‡aJournal of Glaciology and Geocryology. Vol. 25(1) :100-105 (2002). 500 ## ‡aEnglish summary and captions. 520 3# ‡aAddresses problems of constructing cuttings in high-ice-content permafrost during warm season, taking typical construction on Qinghai-Tibet railway as example. Presents typical cutting cross section, contemporary meteorological data and diagrams of layout and charging structure for top and slope blasting holes. Provides principles for successful construction, including: adopt schedule to avoid construction in high temperatures; facilitate water drainage before beginning main construction; it is better to over-, rather than under-excavate, so as to meet required thickness of topsoil replacement; carry out blasting in two layers, initially leaving protecting layer 2 m thick for lessening permafrost disturbance. Make recommendations for blasting hole arrangement charging structure. 546 ## ‡aIn Chinese. 650 07 ‡a624.139 -- Engineering in frozen ground.‡2udc 650 07 ‡a624.133 -- Excavation.‡2udc 650 07 ‡a625.1 -- Railway engineering.‡2udc 650 07 ‡a624.139.55 -- Frozen ground, disturbance by engineering works.‡2udc 650 07 ‡a551.34 -- Geocryology. Frozen ground.‡2udc 650 07 ‡a551.341 -- Permafrost and frozen ground, equipment for investigating.‡2udc 650 07 ‡a551.321.2 -- Snow and ice, methods of sampling, excavating, drilling, etc.‡2udc 650 07 ‡a626.86 -- Drainage.‡2udc 650 07 ‡a622.235 -- Ice and snow, blasting.‡2udc 650 07 ‡a536 -- Heat.‡2udc 650 07 ‡aE12 -- Glaciology: frozen ground / snow and ice engineering.‡2local 651 #7 ‡a(515) -- Tibet.‡2udc 651 #7 ‡a(235.23) -- Kun-Lun Shan.‡2udc 651 #7 ‡a(235.24) -- Himalayas. Karakorum. Tibetan plateau.‡2udc 773 0# ‡7nnas ‡tJournal of Glaciology and Geocryology. ‡gVol. 25(1) (2002) ‡wSPRI-72888 917 ## ‡aUnenhanced record from Muscat, imported 2019 948 3# ‡a20240328