skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #118699:

Prefabricated engineering services for use in Antarctic regions: pipe lines in harsh environments / Joseph Archibald.

Title: Prefabricated engineering services for use in Antarctic regions: pipe lines in harsh environments / Joseph Archibald.
Author(s): Archibald, Joseph.
Date: 1992.
Publisher: Golden, CO: International Society of Offshore and Polar Engineers (ISOPE)
In: Proceedings of the Second (1992) International Offshore and Polar Engineering Conference. Vol. 2. (1992.),
Abstract: Discusses pipe line design and implemention for Australian Antarctic station rebuilding programme. Identifies design requirements and constraints of setting.
Notes:

In: The proceedings of the Second (1992) International Offshore and Polar Engineering Conference. Vol. 2 / Michael S. Triantafyllou, Jin S. Chung, Karel Karal, Alfred L. Tunik, eds.

Keywords: 711.42(2) -- Settlements and stations, specific.
62 -- Engineering and technology.
69 -- Building construction and materials.
69(211) -- Building construction in cold regions.
691 -- Building materials.
M -- Engineering and construction.
(*7) -- Antarctic regions.
(94) -- Australia.
SPRI record no.: 118699

MARCXML

LDR 01572naa#a2200000#a#4500
001 SPRI-118699
005 20240329065123.0
007 ta
008 240329s1992####coua###|#####|0||#0#eng#d
035 ## ‡aSPRI-118699
040 ## ‡aUkCU-P‡beng‡eaacr
100 1# ‡aArchibald, Joseph.
245 10 ‡aPrefabricated engineering services for use in Antarctic regions :‡bpipe lines in harsh environments /‡cJoseph Archibald.
260 ## ‡aGolden, CO :‡bInternational Society of Offshore and Polar Engineers (ISOPE),‡c1992.
300 ## ‡ap. 577-586 :‡bdiags., tables.
500 ## ‡aIn: The proceedings of the Second (1992) International Offshore and Polar Engineering Conference. Vol. 2 / Michael S. Triantafyllou, Jin S. Chung, Karel Karal, Alfred L. Tunik, eds.
520 3# ‡aDiscusses pipe line design and implemention for Australian Antarctic station rebuilding programme. Identifies design requirements and constraints of setting.
650 07 ‡a711.42(2) -- Settlements and stations, specific.‡2udc
650 07 ‡a62 -- Engineering and technology.‡2udc
650 07 ‡a69 -- Building construction and materials.‡2udc
650 07 ‡a69(211) -- Building construction in cold regions.‡2udc
650 07 ‡a691 -- Building materials.‡2udc
650 07 ‡aM -- Engineering and construction.‡2local
651 #7 ‡a(*7) -- Antarctic regions.‡2udc
651 #7 ‡a(94) -- Australia.‡2udc
773 0# ‡7nnam ‡aMichael S. Triantafyllou, Jin S. Chung, Karel Karal, Alfred L. Tunik, eds. ‡tProceedings of the Second (1992) International Offshore and Polar Engineering Conference. Vol. 2. ‡dGolden, CO : International Society of Offshore and Polar Engineers (ISOPE), 1992. ‡wSPRI-119457
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20240329