skip to primary navigation skip to content
 

 

You are not currently logged in

SPRI library catalogue

View a record

Please note: You are viewing the legacy database of the Scott Polar Research Institute Library catalogue. It is no longer being updated, so does not reliably reflect our current library holdings.

Please search for material in iDiscover for up-to-date information about the library collection.


Record #104619:

Morphometric analyses of recent channel changes on the Tanana River in the vicinity of Fairbanks, Alaska / Charles M. Collins.

Title: Morphometric analyses of recent channel changes on the Tanana River in the vicinity of Fairbanks, Alaska / Charles M. Collins.
Author(s): Collins, Charles M.
Date: 1990.
In: CRREL Report. (1990.), Vol. 90(4) (1990)
Abstract: Documents long-term bank erosion rates and channel changes in 14km stretch of Tanana River centred on Goose Island using historical aerial photography from 1938 to 1982. Studies effect of construction of causeway partially blocking river and time required to return to equilibrium after construction.
Notes:

CRREL Report. Vol. 90(4) :iv, 1-48 (1990).

Keywords: 556.51/.54 -- Rivers and streams.
626/627 -- Engineering, hydraulic.
C -- Oceanography, hydrography and hydrology.
(*49) -- Alaska.
(*493) -- Alaska, interior.
SPRI record no.: 104619

MARCXML

LDR 01140naa#a2200000#a#4500
001 SPRI-104619
005 20240328225644.0
007 ta
008 240328s1990####xx#a##|##|###|0||#0|eng#d
035 ## ‡aSPRI-104619
040 ## ‡aUkCU-P‡beng‡eaacr
100 1# ‡aCollins, Charles M.
245 10 ‡aMorphometric analyses of recent channel changes on the Tanana River in the vicinity of Fairbanks, Alaska /‡cCharles M. Collins.
260 ## ‡a[S.l.] :‡b[s.n.],‡c1990.
300 ## ‡ap. iv, 1-48 :‡bill., diags., tables.
500 ## ‡aCRREL Report. Vol. 90(4) :iv, 1-48 (1990).
520 3# ‡aDocuments long-term bank erosion rates and channel changes in 14km stretch of Tanana River centred on Goose Island using historical aerial photography from 1938 to 1982. Studies effect of construction of causeway partially blocking river and time required to return to equilibrium after construction.
650 07 ‡a556.51/.54 -- Rivers and streams.‡2udc
650 07 ‡a626/627 -- Engineering, hydraulic.‡2udc
650 07 ‡aC -- Oceanography, hydrography and hydrology.‡2local
651 #7 ‡a(*49) -- Alaska.‡2udc
651 #7 ‡a(*493) -- Alaska, interior.‡2udc
773 0# ‡7nnas ‡tCRREL Report. ‡gVol. 90(4) (1990) ‡wSPRI-54834
917 ## ‡aUnenhanced record from Muscat, imported 2019
948 3# ‡a20240328